WEGAWOMB™

Current direction: continuous parallel units

Hydropower has been removed as the primary input. The current study targets at least 55% of annual national demand using a few large parallel units, with reduced output or independent hydro backup during maintenance. The one-unit and older multi-module calculators below are preserved studies, not that national plant.

Open 55% target + parallel maintenance study →

Preserved hypothetical design study

This calculator retains the earlier design assumptions. Its numbers are not measured Wegawomb performance, and published results from other machines do not validate them. Read the published benchmarks first. Resizing changes required hardware capacity, not the available mechanical source; enter any different source separately as an explicit assumption.

Magnetic force. Piezoelectric conversion.

One enlarged unit.
A facility-scale target.

Size one integrated Wegawomb unit for a 1 MW load plus 250 kW storage charging. Compare a generator-led hybrid with the piezo-primary research design. Enlarge the unit’s rating—not its energy efficiency by assumption.

Research—not validated performance

A: passing magnets load guided piezo cartridges; parallel conditioned outputs feed a common bus. Bulk-power capability is an open research question, not ruled out or established by this calculator.

Each path keeps its own controls while you switch. Both use real, limited external motion. Novelty and patentability have not been assessed.

Positive recovery is not output greater than all input. The result below subtracts controls, standby use and extra upstream electricity from recovered electricity. The mechanical input still pays for every joule. All starting performance and source values are illustrative—not measurements, promises or national resource inventories.

1 MW generator-led hybrid facility

One machine, not one element: the enlarged rating scales assumed input, active auxiliaries, standby and upstream costs together. Internal magnet, winding and piezo-element counts, size and mass are not solved. Combining capacity does not remove the full-piezo scaling problem. One unit also creates a single point of failure; storage is not a redundant generator.

Cooling requirement: the displayed local rejection is unrecovered mechanical energy plus conversion and auxiliary losses—not a measured heat load. Hybrid cooling must separately qualify bearings, windings, power electronics and storage; the piezo path must locate where mechanical work is dissipated. Do not size a cooler by treating transmission losses or all uncaptured work as heat inside the machine.

Facility architecture and qualification gates
  • Magnetic–piezo: use modular annular banks with captive magnets, adjustable gaps, independently guided preloaded cartridges and travel stops. Provide bank isolation, replaceable cartridges and matched local conditioning before combining outputs. Bulk piezo power density, fatigue life and packing remain unknown; actuator force/travel ratings are not generator power ratings.
  • Power electronics: individually rectify and protect each piezo channel, then use low-leakage conditioning and a load with demonstrated pulse acceptance. Match measured loaded voltage and available energy to startup thresholds. A controller's maximum current rating is not power supplied by the harvester. Avoid combining unmatched raw piezo outputs directly.
  • Generator-led recovery: only use motion that would otherwise be dissipated. Benchmark the original machine, a supported regenerative drive/common DC bus, and the proposed hybrid at the same useful work. Extra piezo loading, controls and drag need their own measurement; the simple comparison below does not price them separately.
  • Heat and mechanics: establish permitted torque, speed, current, ceramic stress, magnet retention, component temperature and fatigue life from selected hardware and tests. Require independent overspeed, overcurrent, overtemperature and emergency-stop protection, plus guarding and safe isolation. Measure component heat before sizing cooling; unrecovered mechanical energy is not all local heat.
  • Scale gate: demonstrate repeatable loaded output and a useful advantage after added drive consumption, controls and standby. At facility scale, compare installed cost, maintenance, downtime and recovered energy with an ordinary regenerative drive or generator. No cost savings are claimed without real installed-cost and maintenance evidence.

The defaults are facility requirements hypotheses, not optimized hardware settings or a construction/safety approval. Zero firm-capacity credit remains appropriate until site availability is demonstrated. The annual schedule is illustrative; the short event does not prove annual energy yield.

Simulation-based hardware requirements

These calculations follow the selected architecture, unit input rating and RPM. They size an idealized load path and cooling envelope; they do not select a buildable rotor, magnet geometry or piezo cartridge. Available source energy and credited electrical output are unchanged.

Edit mechanical and cooling assumptions

Forces, shaft and spring requirements

Local thermal envelope

Candidate materials and equipment

CIPS research evidence — not a facility-scale material rating

Selected research material: copper indium thiophosphate, CuInP₂S₆ (CIPS). The facility conversion settings remain hypothetical; switching the material label does not establish output or transfer another ceramic’s specifications.

Temperature matters: Liu et al., Nature Communications (2016) reports a bulk transition near 315 K (41.85°C), and a transition near 320 K in the studied thin flakes. Composition, thickness and strain affect behavior; this is not a universal damage or service-temperature limit. The 35°C bulk target and 20 kW/°C cooling conductance here are explicit design assumptions, not qualified hardware. HQ Graphene sells research CIPS crystals; availability does not establish a packaged power cartridge.

  • Wu et al., Small (2026): the published abstract reports AFM-based cyclic loading near 7 GPa beyond 10⁷ cycles. This is nanoscale mechanical-fatigue evidence, not loaded electrical-output endurance for a full-size cartridge. Electrical rejuvenation requires an external field; any such energy must be counted.
  • Zhang et al., Advanced Functional Materials (2023): polarized CIPS produced 760 pA short-circuit current at 0.85% tensile strain. Short-circuit current is not delivered electrical energy.
  • Io et al., Nano Energy (2022): a single-nanoflake device reported current and voltage responses. Separate maxima cannot be multiplied to infer useful output.

Unknown for this design: loaded energy per cycle, conversion map, allowable temperature, force and strain limits, packaged fatigue life, contacts and encapsulation. No material has been established here as delivering more usable energy than CIPS while also demonstrating durability under comparable loading.

Which configuration is useful?

Equations and limits of this sizing screen
  • Rated torque = shaft power / angular speed. Equivalent tangential force = design torque / (radius × equally loaded paths). It is not the normal repulsive force between magnets; that needs a force–gap model or data. Rotational power reference.
  • Solid-shaft diameter = cube root of 16 × design torque / (π × assumed allowable shear). This torsion-only lower bound omits bending, keyways, stress concentrations, critical speed, deflection, fatigue and load-sharing errors. It is not a procurement diameter. Torsion reference.
  • Spring stiffness = incremental force / stroke. Incremental elastic energy = preload × stroke + ½ × incremental force × stroke. Throughput = this energy × cycles per second per spring × spring count; it is not electrical generation or a complete damped-cycle work integral. Spring-energy reference.
  • Radial retention load = mass × angular speed² × radius, per drum. It does not give the net bearing load of a balanced rotor or a fastener/adhesive rating.
  • Local heat envelope = entered fraction of rated transfer/conversion/conditioning losses plus active auxiliaries, counted once. Network losses, battery losses and upstream drive losses are outside this envelope. Unrecovered mechanical work is not necessarily heat in the chamber.
  • Water flow = heat / (4,180 × water temperature rise), in kg/s. Required conductance = heat / allowed temperature rise above ambient. Uniform bulk warming starts at ambient with constant heat, conductance and thermal capacity; hot spots, pressure drop, pump/fan selection and loss of coolant remain unresolved. Cooling electricity must fit the existing auxiliary budget or be entered there; changing conductance here does not invent free cooling. Lumped thermal reference · Heat-transfer reference.

Inputs are explicit design hypotheses, not paper-derived Wegawomb performance. Download assumptions + results below to retain this sizing record.

Assumed mechanical rating / unit
—Mechanical work, not magnet strength or a motor nameplate
Assumed design-point output / unit
—After conditioning and active auxiliaries; before network
Annual benefit before storage dispatch
—Generator fleet only; battery event accounted separately
National demand covered
—Bounded by available motion; not a 24/7 supply claim

Piezo-primary · 3D recovery bank

Drag to orbit; arrow keys rotate, +/− zoom. The illustration shows one integrated unit with internal magnetic and piezo elements. It is not a dimensioned CAD model or a validated internal parts count. The open outline indicates an enclosure boundary, not an engineered safety guard. The labels use the event budget below. Motion and displacement are illustrative, not solved magnetic dynamics. Green battery fill shows the modeled end-of-window charge, not a real device reading.

Open the preserved earlier 3D creation ↗

01One enlarged facility unit

Facility values are sizing hypotheses, not measured hardware performance.

Which losses belong to the machine?

Machine losses and distribution losses are different. The regional network percentage is a scenario assumption, not a measured on-site cable or transformer loss. For a behind-the-meter installation, replace it with the engineered delivery-path value in the regional controls; do not assume it is zero.

These figures exclude battery controls, battery conversion losses and curtailed surplus, which appear in the storage ledger. Machine unrecovered work is not automatically heat inside the enclosure. The enlarged rating is not a demonstrated cooling requirement.

Paper-informed spring comparison

Keep the magnetic rotor, guided piezo load path and separately conditioned output. Compare a conventional spring with a tunable, RodOri-inspired linkage inside that architecture. Both cases use the same external force limit, frequency and available mechanical-power cap.

Research hypothesis—not an efficiency upgrade. All numbers below are filled illustrative facility-subassembly assumptions, not values transferred from the laboratory papers. This separate sensitivity screen adds no electricity to the facility or battery totals above. Tuning can change how much external work is absorbed; it does not create energy.

What the three papers contribute
  • RodOri spring metamaterials: experimentally tunable stiffness and vibration response. The studied laboratory assembly spans about 3,200 to 6.79 N/m; those are not facility component ratings. Here, stiffness is an explicit editable hypothesis.
  • Elastic Rod Origami: reconfigurable rod geometry motivates an adjustable frame and strain path. Electrical generation and Wegawomb-scale durability were not established.
  • Porous liquid crystal elastomers: temperature-responsive acoustic behavior motivates an optional research layer. No acoustic-to-electrical gain is credited. Heating starts disabled at 0 W; any externally supplied heating must be entered as a debit. No validated temperature, acoustic or fatigue curve is supplied.

Calculation and design boundaries

A small-motion, linear, force-driven oscillator is assumed: m x″ + (c mechanical + c electrical) x′ + k x = F sin(2πft). Natural frequency = √(k/m)/(2π). Mean absorbed power = ½ c total (2πf × displacement amplitude)². Equivalent electrical damping is an assumption, not a solved piezo circuit or a material conversion coefficient.

When the source cap is reached, ideal force control reduces the excitation. Real source impedance and control losses are not solved. The cases can draw different mechanical power; compare both input and output, not output alone. Mechanical and electrical damping remain the same in both cases, so tuning alone does not improve their conversion ratio.

The motion ceiling is an assumed linkage amplitude, not allowable ceramic displacement or a safety rating. Magnetic gap/force, preload, leverage, piezo stress, nonlinear snap-through, stored-energy transients, fatigue, acoustic response, manufacturing and cost need actual geometry, material data and tests. Heater and reconfiguration energy are externally supplied and subtracted; upstream drive consumption is a separate debit.

Remaining blanks: explicit evidence status
  • Recoverable source and schedule: numeric examples entered; site survey not supplied.
  • Materials and geometry: magnets, retained rotor, tunable linkage, guided preloaded piezo cartridges and protected electronics are concept roles; grades, dimensions and suppliers are not selected.
  • Stress, temperature and fatigue limits: not established; no invented safety limits.
  • Cooling: component heat measurements and rated hardware needed; total unrecovered work is not a cooler specification.
  • Costs, profitability and novelty: not established; supplier quotes, comparable alternatives and a separate prior-art review are needed.

No missing evidence is replaced with a fabricated measurement. All editable design inputs have illustrative starting values; selecting real-measurement entry below deliberately opens a blank record.

Explore a larger design target

100 kW, 1,000 kW or your own target. A requirement, not an output prediction.

This extrapolates the selected operating point, not a proven scaling law. Changing the target does not automatically resize the unit or enlarge its source. Use Resize one unit for load + battery to apply the calculated requirements. It assumes concurrent full-power operation; standby, redundancy, duty-cycle service and continuous supply need separate design.

Serve the load, then store the surplus

The starting facility serves a 1 MW load and targets 250 kW charger input over four hours, with a 1 MWh usable-storage budget. This requires a larger real mechanical source throughout the window; modules do not create that source. Capacity, efficiencies and control consumption are unverified design assumptions. The previous 100 kW study remains available above.

See updated 3D energy path

One constant-source, constant-load event—not annual dispatch. Mechanical power and annual energy cap the example, but do not prove the source is available at that time. The battery sits after the modeled network losses. Output first offsets added upstream draw and battery controls, then serves the load; only the remainder charges storage. During a deficit, only the initial stored energy may discharge, first covering remaining operating obligations and then the load. Stored energy is not added to annual generation or counted again as later delivery. No simultaneous charging/discharging.

“Time to full” beyond the event assumes the surplus continues; the current event does not establish that. Later backup assumes the generator bank is disconnected, so it includes storage controls but no generator standby. A certified charger, battery-management system, protection and site-specific thermal/electrical engineering are required for hardware.

Battery charge/discharge modeling reference ↗

02Set the real motion budget

Use motion that would otherwise be dissipated while delivering the same useful service. A running motor is not automatically a waste source. Zero extra drive consumption is an assumption until measured.

Matching uses equivalent full-power hours, not a time-resolved optimum. The power and annual-energy budgets apply to the whole fleet. Adding modules cannot multiply them. The annual figures describe generation before storage allocation. The separate battery event does not increase annual generation or prove that a load accepts each pulse.

Does the experimental stage help?

Benchmark: idealized direct mechanical loading of the same piezo, using the same captured input, piezo conversion, electronics, auxiliaries and duty—but bypassing the magnetic-transfer loss. This is not measured hardware. Contactless operation might offer wear or isolation benefits; it does not automatically increase electricity output.

03Kenya comparison

Peak-coincident source power starts at zero: available annual energy does not establish dependable capacity. Peak credit is an assumption screen, not an accreditation or reliability study. No country-scale waste-motion resource, cost saving or profitability has been established.

Check an engineering energy record

The default is a filled, read-only, 60-second worked example from the per-unit design point, before network and storage. It is not a measurement and does not change the simulation. To enter real synchronized measurements, select the blank user-record option. Include stored rotor, spring and electrical energy. Never multiply open-circuit voltage by short-circuit current to claim power.

For real records, output is energy delivered into a load after internal controls; enter only separately powered auxiliaries separately. Extra upstream electricity compares the same useful task with and without recovery; use the full drive electricity for a motor-only generation test. Example zeros for stored-energy change and added drive are assumptions, not observations. Calibration, uncertainty, matched conditions and repeated trials remain necessary. Reloading or switching/resetting clears user entries; download the report to retain them.

Facility engineering before deployment

  1. Define the site’s genuinely recoverable mechanical source, duration and annual schedule before assigning load coverage. Select hardware rated for the intended electrical, mechanical and thermal duty; this planner is not an authorization to connect to a building or grid.
  2. Use a guided, magnet-backed pressure cap, rigid support, travel stops and mechanical retention for every magnet. Avoid impacts, tensile stress and sideways loading of brittle ceramic. Set the gap and preload from measured forces and the specific element’s limits.
  3. Measure force and displacement together, shaft torque and speed where applicable, and simultaneous voltage/current into a real load. Integrate work and electrical energy over complete cycles. Begin and end with equal rotor/spring stored energy or account for its change.
  4. Compare no harvester, magnetic–piezo recovery and direct mechanical piezo loading under the same useful task. Count any extra upstream motor electricity, cooling, controls, rectifier losses and standby draw.
  5. Use temperature sensing and shutdown protection. Unrecovered energy is not all local heat; measure where it is dissipated before sizing a heat sink, fan or chamber. Fan consumption belongs in the budget.
  6. Keep the device only if measurements show a useful recovery or contactless-operation advantage at acceptable cost and fatigue life. Greater force or RPM is not a substitute for a measured safe operating envelope.
Model limits and exact calculation rules
  • Captured annual energy = the minimum of the fleet’s annual source budget and min(source power, module count × assumed absorbed module power) × 8,760 × duty fraction.
  • Converted energy = captured energy × transfer fraction × piezo conversion fraction × conditioning fraction. These fractions do not substitute for force–displacement, capacitance, frequency or load measurements.
  • Equivalent full-power module-hours = captured energy / module input power. In facility mode, fixed auxiliary and entered upstream draw apply to all installed modules for scheduled operating hours; standby applies to the remaining hours. During a facility event all installed modules remain energized. Legacy large studies instead use ideal equivalent full-power staging. Constant efficiencies are not measured part-load curves.
  • Net benefit = electricity delivered after network losses − auxiliary electricity imported − extra upstream electricity. Negative cases remain negative. Zero motion provides no recurring output.
  • The direct-loading benchmark removes only the assumed magnetic-transfer loss. It does not prove that the same mechanical operating point is attainable without redesign.
  • Repeated piezo output requires changing stress. A capacitor may smooth pulses, but stores—not creates—energy. Startup thresholds, power quality, pulse-level load matching and annual battery dispatch are not simulated. A separate constant-window battery screen accounts for capacity, power limits, charge/discharge loss and initial stored energy.
  • The economics panel is conditional screening with editable costs and annual energy allocation, not a profitability forecast. Missing prices stay unknown; storage-event energy is not annual revenue.
Engineering references

These references inform the engineering approach, not the numerical Wegawomb presets. Hardware performance and novelty remain unverified.